The Termite Control Maintenance Ideas

The Of Termite Control MachineThe smart Trick of Termite Control Liquid Or Bait That Nobody is Discussing

8 Simple Techniques For Termite Control Maintenance


With a termite baiting program, there can be no absolute guarantee of long-term protection of nearby buildings. There may be other termite nests nearby the building that do not find the bait stations. Your home is a considerably bigger bait station. Other termite nests may exist in trees, under concrete on-ground flooring and in-fill patios of neighboring lands. .

The Sentricon baits are placed in their in-ground lure stations after elimination of the infested lumber therein. This may involve sufficient disruption of these termites such that they prevent the in-ground Sentricon bait station, entirely.

This severe short-coming is overcome by the patented Exterra Termite Stations in which the lumber is aligned around the cylinder such that the lure can be inserted with no disturbance of these termites present.

RECOMMENDATION: Exterra or Sentricon be used where a comprehensive chemical soil barrier treatment using Termidor or Premise is not practicable or desired, and in which a several thousand termites are likely to eat the bait.

 

 

An Unbiased View of Termite Control Maintenance


A termite monitoring and baiting program can be integrated with a range of methods including (1) drilling vulnerable trees and eradication of any termite nest situated therein, and (2) in conjunction with a follow up chemical soil treatment using Termidor or Premise.

Rapid termite colony development and building infestation is usually connected with a readily available timber food and moisture supply nearby the central nest. In addition, buildings are often constructed in a manner that allow termites to gain undetectable entry from the soil into the structural timbers of the building. Listed below are some helpful recommendations for the home owner to carry out in order to reduce the possibility of termite activity inside a building. .

Moisture exclusion from inside the wall cavities, around the base of the building and sub-floor area (if any). Water run-off can be excluded from a sub-floor area from the installation of ag-drains. Make sure there is sufficient cross flow ventilation in the sub floor area. In addition, a qualified plumber should be engaged to ensure there is no water leakage from plumbing pipes in the bathroom, the shower recess, kitchen, down pipes, guttering and air conditioning unit overflow.

 

 

Unknown Facts About Termite Control Machine


Please note: high humidity, dampness or moisture accumulating in a wall cavity is obviously high risk to encouraging large scale termite activity inside the building. .

Removal of any timber in contact with the ground. Timbers should be stored above ground to allow full inspection of subterranean termite activity (coming from the soil thereunder). Any landscaping using wood chip mulch and railway sleepers should definitely be eliminated, as they supply prepared food supply to help in quick termite colony development. .

Ensure inspection access is unimpeded, particularly in sub-floor regions (suspended flooring ) in order to look for evidence of termite activity. home If your house is on a concrete slab on ground flooring, internet be certain that you can inspect the entire external slab border for evidence of termite mud-shelter tubes. Do NOT allow this area to be coated by pavers, landscaping, planter pots, etc, as termites often gain entry into the walls of a building via this locality, especially through external weep holes and minute (2 mm) openings in the mortar in brick-work. .

 

 

The Buzz on Termite Control Liquid Or Bait


Should you find live termites or termite damaged timbers DO NOT disturb the region. DO NOT use spray can or insecticides on the termites. If sufficiently disturbed, the termites will probably move elsewhere, and might not be rediscovered until additional obvious damage has been done. The termite controller can introduce Intrigue termite dust or Exterra termite bait directly to the live termites present in an attempt to eliminate the entire termite colony - as discussed in detail above. .

Consumer Note: the installation of a chemical soil barrier does not negate the need for routine competent inspections - at least 3 to 6 months where the termite risk is elevated.

 

 

Unknown Facts About Termite Control Liquid Or BaitTermite Control Maintenance for Beginners
We recommend 3 or 6 monthly inspections be carried for the first 2 years following a chemical soil treatment. Monitoring of "stand-alone" baiting systems

BE AWARE the right identification of harmful termite species, inspection of a building for tell-tale signs, analysis of circumstances and implementation of an effective termkite control program requires expert skill and judgement depending upon professional training and extensive field-work experience in termite control in a wide variety of circumstances.

 

 

Fascination About Termite Control Liquid Or Bait


Termites, also known as white ants, are little soft bodied insects around half the size of a match-head. It is estimated that they cause more damage to homes in Australia than from flood, fire and storms combined. The harm is so good that termite damage is not covered by insurance meaning its a problem that you need to keep on top of with Termite Pest Control.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Comments on “The Termite Control Maintenance Ideas”

Leave a Reply

Gravatar